All places

Snowy River National Park

National Park · VIC · Parks Victoria

Snowy River National Park: 2 closures listed by Parks Victoria as of 8:59 am Mon 30 Nov 2026 (Melbourne time): MacKillops Bridge closure for repair works and McKillops Bridge closure for repair works.

Some areas closed

Parks Victoria's alerts last changed 8:59 am Mon 30 Nov (Melbourne time).

Check before you go: Parks Victoria · Fire bans: CFA

Where it isThe park's approximate centre.See it on Google Maps

What's closed

  • MacKillops Bridge closure for repair works

    Parks Victoria · Partial closure

    MacKillops Bridge closure for repair works

    Repairs are being carried out on MacKillops Bridge (MacKillops Road) which crosses the Snowy River in Deddick Valley, East Gippsland. Work is expected to start in early November 2026 and be completed in December 2026. The bridge will be closed from 7am to 5pm, Monday to Friday. There will be limited opportunities for vehicles to cross depending on the stage of the works. A reduced speed limit and the existing load limit for the bridge will be in place. MacKillops Bridge is of heritage significance. The current bridge was built in 1935. The works involve replacing some timber components of the bridge, including the deck timbers. For more information about this project, email gippslandprojects@transport.vic.gov.au

    First seen 2:19 pm Mon 2 Nov (Melbourne time) (Parks Victoria gives no times). Checked 8:59 am Mon 30 Nov (Melbourne time). Read it on the Parks Victoria site.

    Changes of conditions © Parks Victoria, licensed under CC BY 4.0

  • McKillops Bridge closure for repair works

    Parks Victoria · Partial closure

    McKillops Bridge closure for repair works

    Repairs are being carried out on MacKillops Bridge (MacKillops Road) which crosses the Snowy River in Deddick Valley, East Gippsland. Work is expected to start in early November 2026 and be completed in December 2026. The bridge will be closed from 7am to 5pm, Monday to Friday. There will be limited opportunities for vehicles to cross depending on the stage of the works. A reduced speed limit and the existing load limit for the bridge will be in place. MacKillops Bridge is of heritage significance. The current bridge was built in 1935. The works involve replacing some timber components of the bridge, including the deck timbers. For more information about this project, email gippslandprojects@transport.vic.gov.au

    First seen 2:19 pm Mon 2 Nov (Melbourne time) (Parks Victoria gives no times). Checked 8:59 am Mon 30 Nov (Melbourne time). Read it on the Parks Victoria site.

    Changes of conditions © Parks Victoria, licensed under CC BY 4.0

Other alerts (3)

Cautions

  • Ground shooting operations targeting deer · Parks Victoria

    Parks Victoria · Caution

    Ground shooting operations targeting deer

    Control operations (ground shooting) targeting deer are undertaken in this area. The Park will remain open to visitors during these operations. For more information about Parks Victoria deer control to protect biodiversity, please visit: https://www.parks.vic.gov.au/get-into-nature/conservation-and-science/conserving-our-parks/feral-animals/deer

    First seen 8:10 am Thu 1 Oct (Melbourne time) (Parks Victoria gives no times). Checked 8:59 am Mon 30 Nov (Melbourne time). Read it on the Parks Victoria site.

    Changes of conditions © Parks Victoria, licensed under CC BY 4.0

  • Seasonal deer hunting by stalking permitted in Snowy River National Park from February 15 2026 · Parks Victoria

    Parks Victoria · Caution

    Seasonal deer hunting by stalking permitted in Snowy River National Park from February 15 2026

    Hunting is permitted east of the Snowy River between the 15th February and the 15th December each year. No hunting or carriage of firearms is permitted on the Snowy River or in areas of the park west of the river. Hunting is not permitted in Reference Areas or within 100m of campgrounds and picnic areas. For more information go to https://www.parks.vic.gov.au/things-to-do/hunting The Game Management Authority is responsible for regulating all game hunting activity in Victoria. Visit their website www.gma.vic.gov.au for all information regarding hunting in Victoria, including licences, maps, where and when to hunt and all regulations.

    Dates: “and the 15th December”

    First seen 8:10 am Thu 1 Oct (Melbourne time) (Parks Victoria gives no times). Checked 8:59 am Mon 30 Nov (Melbourne time). Read it on the Parks Victoria site.

    Changes of conditions © Parks Victoria, licensed under CC BY 4.0

Other notices

  • 4WD Track Maintenance · Parks Victoria

    Parks Victoria · Notice

    4WD Track Maintenance

    The following 4wd Tracks are closed for essential maintenance and machinery works along the Snowy Icon Drive. - Deddick Trail - Bowen Track - Collings Track - Reeds Track - Warm Corners Track - Warbisco Track - Bowen Link Track - Monkeytop Track - Rich Knob Track - Waratah Flat Road (from seasonal gate) For your safety these tracks have been closed to vehicles. The tracks remain open for walking access except inside machinery zones. They will re-open following completion of works expected Mid December 2026.

    First seen 2:18 am Thu 29 Oct (Melbourne time) (Parks Victoria gives no times). Checked 8:59 am Mon 30 Nov (Melbourne time). Read it on the Parks Victoria site.

    Changes of conditions © Parks Victoria, licensed under CC BY 4.0